Cirrus, located a few miles west of downtown Denver, features 292 apartments on a 2-acre parking lot west of Mile High Stadium and helps address Denver’s affordable housing shortage. The units comprise 58 studios, 169 one-bedrooms, 62 two-bedrooms, and 3 three-bedrooms. In total, the development provides 286,787-square-feet of residential space.
The project used Mercer Mass Timber’s cross-laminated timber (CLT) for five of the seven stories, totaling nearly 230,000-square-feet. The CLT used included both 5-ply and 7-ply and was exposed on the ceilings inside the units.