High Line Timber Bridge

Market Sector

Public Works

Scope

Location

Size

255 ft. long

Stories

-

Status

Completed 2023

Owner

Empire State Development, the Port Authority of New York and New Jersey, Brookfield Properties Group, and Friends of the High Line

Architect

SOM

Structural Engineer

General Contractor

Products

Glulam: Manufactured by Mercer Mass Timber

Product Volume

280 m3

About

The High Line Timber Bridge is one of two pedestrian bridges that make up the Moynihan Connector and is designed to seamlessly connect public open spaces to transit within the greater bustling urban landscape of Midtown West in New York City.

Situated within Manhattan West’s public plaza, the Timber Bridge is not only an architectural marvel but also a testament to the fusion of beauty and resilience. Sourced and imported from British Columbia, each beam of the Alaskan Yellow Cedar was assembled at street level. Once pieced together, the finished sections boasted a combined weight of approximately 256,700 pounds of mass timber. These colossal sections were then seamlessly lifted into their positions by cranes in mere hours. As time goes on, instead of being treated or painted, the wood will be left to weather naturally, allowing it to gracefully age to a silver patina, further enhancing its beauty in the urban landscape.

Using the Warren truss method, patented in 1848, which utilizes equilateral triangles, this design is a masterful blend of weight-efficiency and strength. The meticulous design required complex timber connections, specially crafted to guarantee water-tight joints. The engineering team’s commitment to excellence is evident; they went to great lengths to ensure the water tightness and the long-term durability of the bridge. This dedication is further showcased in the craftsmanship of certain elements, such as the rain caps. Additionally, the intricate manner in which all the connections are discreetly concealed within the wood demanded an exceptional level of care and effort. This precision was not limited to the factory alone but extended to the final field assembly, ensuring that nothing detracted from the seamless wood aesthetic. Furthermore, the bridge’s design incorporated additional triangular geometry on its top members and chords, a feature that swiftly displaces water, further contributing to its longevity.

Transporting the impressive 90 ft+ glulam members posed its own challenges. Originating from western Canada and destined for the eastern USA, the mammoth task of navigating the bustling streets of New York was addressed by employing a haul trailer equipped with a remote rear steerable dolly..

Spanning 255 feet as it cantilevers across Dyer Avenue and rising 25 feet above it, the High Line Timber Bridge was constructed from 163 glue-laminated beams made from Alaskan Yellow Cedar, a wood renowned not only for its striking aesthetics but also for its robust resistance to the elements.

Bring your next project to life

Let Mercer Mass Timber be your partner in bringing your next project to life – fill out the form to get started and see how we can make your building process a success.

By submitting this form, you agree to our privacy policy and will get communication from Mercer International.

This website is using cookies

We use them to give you the best experience. If you continue using our website, we’ll assume that you are happy to receive all cookies on this website. Learn more about our Privacy Policy.